EW volume comparison between MiTS 1 and MiTS 2

Objective: Comparison of Earthwork volume between MiTS 1 and MiTS 2 Volume Needed Before Compact Fill: (Before MiTS 1.11.1.1 & MiTS 2.0.40.0) Volume Needed Before Compacted Fill = Bank Fill * [1+ (1-Soil Shrink Factor)] (After MiTS 1.11.1.1 & MiTS 2.0.40.0)...

Behaviour for Slope In Cut Section for Vdrain

The measurement of Earthworks slope cut section with vdrain is measured from one flat berm to the next flat berm. Users might get confused and found that the measurement is different with the one assigned in the platform editor and might as well found out that the...

Depth Below Invert

Depth below invert is a space or certain depth of sump that function as rubbish/leaves or sediment trash to avoid blockage of outlet pipe. In order to insert the space depth, users may click on “Node > Spread Input > Depth Below Invert” Eg: Node 3 has Depth Below...

How to Send Backup MiTS 2 Project File

MiTS 2.1.16.0 and below, the loupe file and the backup file are separated. Therefore, users are needed to follow the following sections in order to append project file and loupe file.  i. Backup Project File Following are the steps backup the file for MiTS 2 a. Click...

MiTS 2: Announcing the support for BIM software

We are glad to announce that starting from MiTS 2.1, MiTS 2 officially supports BIM software, such as Navisworks, Tekla BIMsight and many, many others. You can now export the entities in MiTS 2 and import them into other software, for purpose like clash checking, cut...

Open Loop in Road

“Open Loop” in road is used to open the loop of a closed road design whereby the Start and End point are at the same location, in which users may encounter such situation when modelling a roundabout. For closed loop, any amendments or additional of points, the design...